More selected projects

Rail trolley

 

In this phase, the parameters of the current track are obtained, as well as the difference to a theoretical axis/grade, and its difference to reach them; its necessary lifting and ripping is certified.

As for the advantages for which the use of the track trolley stands out compared to other methods, the speed stands out, especially for exporting graphs and tables of observed data. It allows you to give the tamper real-time data on the state of the road or also export the data to give it without edits. It also allows for less mesh pitch without reducing productivity.

The rail trolley saves the need to pass through the same point with the total station, since with the trolley it is possible to obtain all the necessary parameters: level, width/cant ruler and arrow handles.

 

 

Case Studies

 

Rail Trolley Llerena

Client: ASCH
Date2022
Location: Badajoz (Spain)
Scope: Rail Trolley provider for rail auscultation

Dynamic Rail Trolley - FGV (Generalitat Valenciana Railways)

Client: FGV
Date:  2022
Location: Valencia (Spain)
Scope: Metro Valencia rail interchanges auscultation. 65 Km.

Recoletos-Atocha-Chamartín Tunnel (7 km)

Client: Mediodía Recoletos Joint venture
Date:  2019
Location: Madrid (Spain)
Scope:
Track assembly, topography and technical assistance on Recoletos-Atocha-Chamartín Tunnel. 9 survey crews.